The smart Trick of Ground Resistivity Testing Bangladesh That Nobody is Discussing
This paper establishes the connection among the magnitude from the lightning stroke, the tower prime voltage and hence the again-flashover voltage that would appear on the line, which would lead to power interruptions. Surge arrestors have been modelled, using the MATLAB application, along with the expected quantity of surge arrestors for each phas